Skip to content

Find out what AI changes in delivery, before you roll it out further

AndonPulse is an AI impact platform for engineering teams. It compares pilot teams with control teams, before and after rollout: cycle time, throughput, review time and returns from QA, with the work behind every number.

Claude Code pilot results, 8 pilot weeks against the 8-week baseline, 2026. Tasks closed +22%, control teams +2%. Cycle time −15%, control −3%. Review time +20%, control 0%. Returns from QA 0%. A bar chart shows the change against the baseline for pilot and control teams.

Read-only connections to the tools your teams already use

  • Jira
  • GitHub
  • GitLab
  • Linear
  • Claude Code
  • Codex
  • Cursor
  • GitHub Copilot
All integrations

Plenty of opinions about AI. Little evidence of what it changed.

Usage numbers show that people use AI. Only a comparison with the same work, before AI and without it, shows what changed.

Everything changes at once

New hires, smaller tasks and a quieter quarter move the numbers too. Without a control group, every change looks like the effect of AI.

Speed moves the wait

Faster coding can push the wait into review and QA. Output goes up while the work waits longer for a reviewer.

Quality needs its own number

Throughput alone doesn’t show rework. Returns from QA and reopened Issues show whether faster work holds up.

From a pilot signal to a rollout decision, in five clicks

Tasks closed per week by pilot and control teams, Apr 6 to Jul 24, 2026, with a marker at the pilot start on Jun 1. Pilot teams go from about 50 to about 63 tasks a week. Control teams stay near 40.
Claude Code weekly active users in the pilot teams, Jun 1 to Jul 26, 2026: 22 of 24 engineers in Platform and 16 of 18 in Payments from the second week.
Time in workflow stages in the pilot teams, in days, Apr 6 to Jul 24, 2026. Baseline: development 1.9, waiting for review 0.6, review 0.4, waiting for QA 0.5 and QA 0.7, 4.1 in total. Pilot: development 1.1, waiting for review 0.8, review 0.4, waiting for QA 0.5 and QA 0.7, 3.5 in total.
Review time by pull request size in the pilot teams, Jun 1 to Jul 24, 2026: small 0.6 days, medium 1.1 days, large 2.4 days.
Claude Code rollout plan by team, June to September 2026. Platform, 24 engineers, and Payments, 18: done, from Jun 1. Planned: Growth, 22, from Aug 3. Identity, 14, from Aug 17. Data, 16, from Sep 7. Mobile, 26, from Sep 21.

Spot the signal

After Claude Code arrived on Jun 1, the pilot teams closed 22% more tasks a week. The control teams changed by 2% over the same weeks.

The baseline is the eight weeks before the start date, Apr 6 to May 29.

Check that the pilot used the tool

In Platform and Payments, about 90% of engineers used Claude Code every week of the pilot.

A pilot team where few people use the tool doesn’t test the tool.

Open the stages

In the pilot teams, development went from 1.9 to 1.1 days. Waiting for review went from 0.6 to 0.8 days, so part of the gain now waits in the review queue.

Stages come from your Jira or Linear workflow and from pull request events.

Find the cause

In the pilot period, large pull requests take 2.4 days in review, four times as long as small ones.

AndonPulse shows a correlation, not proof of cause. It shows where to look.

Decide what to change

Roll Claude Code out to the other four teams, with a limit on pull request size: Growth and Identity in August, Data and Mobile in September. Then follow each team against its own baseline.

AndonPulse shows what changed after rollout, and then whether the next change worked.

Book a demo

How AndonPulse measures AI impact

Tasks closed per week in Platform and Payments over the 8-week baseline, Apr 6 to May 29, 2026, with a marker at the pilot start on Jun 1. Platform closes 26 to 29 tasks a week, Payments 22 to 23.

What did delivery look like before AI?

The same metrics for the same teams over a period before rollout. By default, the baseline is the eight weeks before the start date.

Counted from
Git history and your Jira or Linear workflow.
Read it with
The change. Without a baseline, a number has nothing to be compared with.
Claude Code weekly active users in the pilot teams, Jun 1 to Jul 24, 2026: Platform 92% and Payments 89%.

Who is compared with whom?

Pilot teams that use the tool and control teams that work as before, over the same weeks. Where there is no control group, AndonPulse compares work with and without an AI trace in the same teams.

Counted from
Team membership, Admin API activity and the AI trace in GitHub.
Read it with
Adoption. A pilot team where few people use the tool doesn’t test the tool.
Change against the baseline after 8 weeks, pilot and control teams. Tasks closed +22% and +2%. Cycle time −15% and −3%. Time to merge −14% and −2%. Review time +20% and 0%.

How much faster, and how much more?

Change in cycle time, throughput and time to merge against the baseline, for pilot and control groups.

Counted from
Pull request events and your Jira or Linear workflow.
Read it with
Quality guardrails. Speed counts only when quality holds.
Returns from QA by week for pilot and control teams, Apr 6 to Jul 24, 2026, with a marker at the pilot start on Jun 1. Both stay near 8%.

Did quality hold?

The share of work that returns from QA or is reopened, and review time, for the same groups and weeks.

Counted from
Status changes in Jira or Linear and review events in pull requests.
Read it with
Delivery change. More output with more returns is not a gain.

What it doesn’t tell you. AI impact shows a correlation, not proof of cause. A control group working over the same weeks rules out the most common other explanations, such as a release freeze or holidays. A new process or a different mix of tasks can still move the numbers, so read the result together with the team.

What you can do with an AI impact analytics platform

Did delivery change after rollout?

Today
Cycle time is lower after rollout, and nobody knows whether the teams without AI got faster too.
With AndonPulse
Cycle time, throughput and time to merge for pilot and control teams, before and after AI rollout, in one view of AI engineering impact analytics.

Each team is compared with its own history first, so team size and workflow don’t distort the result.

Cycle time in the baseline and the pilot period, for the pilot group and the control group, 2026. The pilot group goes from 4.1 to 3.5 days. The control group goes from 3.9 to 3.8 days.

Which work changed?

Today
A team average mixes the work done with AI and the work done without it.
With AndonPulse
Cycle time of work with an AI trace next to the same teams’ work without it, for every team.

AI-authored, AI-assisted and unknown work use the same definitions as AI measurement.

Cycle time with and without an AI trace by team, October 2026: Platform 2.6 and 3.3 days, Payments 2.9 and 3.5, Growth 2.7 and 3.3, Identity 2.9 and 3.4, Data 3.0 and 3.5, Mobile 3.0 and 3.6.

Did quality hold?

Today
Speed gets a report. Returns from QA get a look only when something breaks.
With AndonPulse
Returns from QA, reopened Issues and review time next to every speed number.

A gain in speed that brings more returns shows up as both.

Returns from QA by team, baseline against the pilot period, 2026: Platform 8% and 7%, Payments 8% and 9%, Growth 7% and 7%, Identity 8% and 8%.

Built around your delivery model

AndonPulse measures impact against the way your teams already work. You set the decision rule before the pilot starts: one target, a few guardrails, and what you will do with each result.

Try it. Move the review time limit on the right and watch the verdict change.

  1. Scale if the target is reached and every guardrail held.
  2. Change if the target is reached and a guardrail is crossed.
  3. Stop if the target is not reached.

Pilot plan · Claude Code · set before Jun 1

Target

Cycle time

−10% or better −15%

Guardrail

Review time

+20%

Guardrail

Returns from QA

+2 pts max 0 pts

Guardrail

Change failure rate

+2 pts max +1 pt

Scale: roll out to more teams

Change: limit PR size

Stop: end the pilot

Results compare 8 pilot weeks with the 8-week baseline. Change failure rate comes from the same deployment data as DORA metrics.

One platform. AI impact is one of its views.

Connect your tools once. The same delivery model powers every view.

Engineering delivery

AI analytics

Planning & finance

Initiatives across teams on one timeline.
One Deliverable bar: work done so far, work left at the current pace, the planned date and the forecast.

Every initiative, its forecast, and the work behind it.

Open this view
DORA metrics: deployments by month, change failure rate by month, lead time for changes of 19 hours and time to restore service of 0.7 hours.

Delivery speed and stability, with the deployments and pull requests behind each change.

Open this view
For each sprint, carryover, newly committed and added work next to completed and added-and-completed work.

Which sprint work is at risk before the review, and why it carried over.

Open this view
Pull request metrics: time to merge for each pull request, lifetime by stage with 14 hours waiting for the first review, and 219 merged pull requests.

Where reviews wait, and who carries the load.

Open this view
AI measurement: merged pull requests by AI trace and team, review time with and without AI trace by week, 45% of pull requests with AI trace and 70% of engineers weekly active on an AI tool.

See how much of your work involves AI coding tools, by team.

Open this view
Cycle Time with and without AI.

Compare Cycle Time for work with and without AI assistance.

AI adoption: weekly active users of each AI tool by month, Copilot seats by team with the seats that had no activity in 30 days, 54% weekly active share of Copilot seats and 53 unused seats of 250.

Follow how AI coding tools spread across teams over time.

Open this view
AI tool cost next to the value of engineering hours saved.

Put the cost of AI tools next to what they change.

Open this view
Share of effort by type of work, month by month.

Where engineering capacity goes, compared with the plan.

Capitalizable hours and cost, with engineering hours by category.

Audit-ready R&D reports from measured work.

Open this view

Up and running on your data

No new fields and no timesheets. Our customers saw first results in 2 to 4 weeks.

  1. 5–15 minutesConnect your tools

    GitHub or GitLab, Jira or Linear, and the Admin API of each AI tool. AndonPulse only reads from them.

  2. Same dayLoad your history

    Git history comes in at once and gives you the baseline. AI tool history goes back only as far as each tool’s API keeps it.

  3. With our teamMatch people and teams

    Each person is matched to a team by email or GitHub login, and checked on your data.

  4. Weeks 2 to 4Run your first impact review

    Your pilot, week by week, against the baseline and the control teams.

  • Separate database for each customer
  • SSL/TLS and encryption of sensitive data
  • Read-only integrations
Trust Center

Questions about AI impact in AndonPulse

What does an AI impact platform measure?

An AI impact platform shows what changes in delivery when engineers use AI coding tools: cycle time, throughput, time to merge, review time and returns from QA. AndonPulse compares the same teams before and after rollout, and pilot teams with control teams, so every change leads back to the work behind it.

Can it compare teams before and after AI rollout?

Yes. You set the start date and the teams. AndonPulse builds the baseline from your history in Git and Jira or Linear, so the comparison starts with data you already have. As an AI impact tracking platform, it keeps following the same teams after rollout, week by week.

How do you identify AI-assisted pull requests?

Each pull request gets one of three states. AI-authored: an agent created the commit or pull request. AI-assisted: a person is the author, and the commit carries an AI tool marker. Unknown: there is no marker. Unknown is never counted as work without AI, because autocomplete leaves no trace in Git.

Can AI speed up coding but slow down review?

Yes, and it happens often. Faster coding produces more and larger pull requests, which can wait longer for a reviewer. AndonPulse shows review time and returns from QA next to every speed number, so a gain in one stage doesn’t hide a queue in the next.

How do you measure AI developer productivity impact without ranking people?

AI developer productivity impact is measured at the team level: the same team before and after rollout, or pilot teams next to control teams. Per-person data is used only to match people to teams. AndonPulse has no developer leaderboards or individual scores.

How much data do I need for a reliable result?

Enough tasks and pull requests in each group to see a difference larger than the usual week-to-week swings. AndonPulse shows how many tasks are behind every result, and marks results based on too little data. In the example on this page, two pilot and two control teams over eight weeks gave close to 500 closed tasks in the pilot group alone.

Does AndonPulse prove that AI caused the change?

No. It shows a correlation, not proof of cause. A control group working over the same weeks rules out the most common other explanations, such as a release freeze or holidays. A new process or a different mix of tasks can still move the numbers, so read the result together with the team.

Is AI impact a separate product?

No. AI impact is one view of AndonPulse. As an AI impact intelligence platform, AndonPulse runs AI impact on the same data as AI measurement, adoption and ROI, cycle time, pull request analytics and DORA metrics. AI modules are part of the same plans, and you connect your tools once.

Your data. Our help getting started.

Get started with our help

Request free access to AndonPulse. We’ll schedule a guided session and help you get from connected tools to useful insights.

  1. 01

    Tell us about your team

    A few details help us tailor the session to your tools and goals.

  2. 02

    Get a guided setup session

    We’ll help you connect your tools, set up your workspace, and understand your data.

  3. 03

    Start with free access

    Use the free Developer Productivity plan for teams of up to 10, or try paid capabilities free for 14 days.

Connect your existing tools without changing your workflow.

Free access, with a helping hand

Request free access

We’ll email you to arrange a guided session before you receive access.

People whose engineering work you want to understand.