Software capitalization you can prove, down to the minute

AndonPulse is software capitalization software that builds your CapEx report, ASC 350-40 and IAS 38 aligned, from the work already in your issue tracker. Real measured hours, each one traceable to the exact task, with no timesheets.

Free plan for teams of up to 10. Free 14-day trial on paid plans.
Connect your existing tools without changing your workflow.

Time Breakdown report with one capitalized number expanded to reveal the underlying work

Capitalizing software shouldn't be this painful

If you capitalize with timesheets, here's what you're up against:

You can't prove the numbers

A timesheet gives you a total, but no way to show an auditor the actual work behind it.

It eats days every month

Finance pulls the numbers together by hand from data scattered across people and tools, and engineers resent logging it.

The numbers are wrong

Hours get logged to the wrong task or guessed from memory, and a single day can add up past eight.

You capitalize less than you should

When no one can tell which work qualifies, anything ambiguous defaults to OpEx, so you understate what you're entitled to capitalize.

Capitalization you can measure, prove, and defend

Every hour shows the work behind it

Todayyou hand finance a total, with nothing to show the auditor when they ask how you got it.

With AndonPulseevery capitalized interval links to the exact issue, the status change that produced it, and the rule that captured it, so any number is defensible on demand.

Work Allocation screen listing working intervals, each row showing the issue, time interval, capitalizable flag, and the matched rule

Real measured hours, not estimates

Todaytime is guessed from memory or logged to the wrong task, and nobody catches it.

With AndonPulsehours are reconstructed from the real task history, split fairly across concurrent work, and capped at a true eight-hour day, so the totals are right without anyone checking.

Time Breakdown pivot of measured hours by employee, issue, and day with daily and monthly totals

You decide what counts, and it takes minutes

Todayevery month is a manual scramble to gather the data and decide what qualifies.

With AndonPulseyou set simple rules for what qualifies once, they run automatically every month, and they recalculate past months whenever you change them. Setting them up is quick, and we're here to help if you want.

Rules Settings screen with the rule builder showing conditions for task type, status, and label plus the credited person

Time off never counts as work

Todaytimesheets never reconcile against the leave system, so non-capitalizable holidays, vacation, and sick days slip into the total.

With AndonPulseconnect SageHR, BambooHR, or your HR system and we subtract holidays, vacation, and sick days automatically, so every figure reconciles with the leave system.

Capitalizable hours breakdown reconciling total tracked hours against non-capitalizable OpEx work and time off — vacation, public holidays, and sick days pulled from SageHR and BambooHR

Capitalization Finance and Engineering both sign off on

With AndonPulse I can tell an auditor why a task capitalized 2 hours, not 50 — every number traces back to the work. We write the rules ourselves, so the math is fully transparent.

— Eugene Gusarov, Director of Product and Engineering, NetNation

How it works?

1

Connect your issue tracker

Link the systems engineering already uses. Read-only.

2

Connect your HR system

Link SageHR, BambooHR, or your HR system, and we automatically pull holidays, vacation, and sick days so they never count as working time. Read-only.

3

Set up your capitalization rules

You decide what qualifies, based on the fields your team already uses (task type, status, label) and who gets credited. It takes minutes, and we're around to help.

4

Review, trace, and approve in the app

See every attributed interval and the rule that matched it, drill into any number to the source work, and approve. The eight-hour daily cap and weekend exclusion are already applied.

5

Generate the audit-ready report

Export hours by employee, issue, and day. Every figure traces back to the work, so when the auditor asks, the answer is one click away.

AndonPulse measures the work and does the math. You set the policy and approve the result, instead of chasing timesheets every month

Built around your workflow

Built on the tools your engineering team already uses

Explore connections for the tools your team already uses.

Explore all integrations
The portfolio view: every initiative across teams on one live Gantt timeline, the delivery-visibility view your VP of Engineering uses.

Powered by the same engine your engineering leaders use for delivery visibility

The data behind your capitalization report also helps your VP of Engineering catch slipping initiatives before they are late.

See it on your own numbers

Guided demo and setup. Free plan or 14-day trial. No workflow changes.